Home/Weldmaster

All welding, connected.

Weldmaster is one program for your entire welding documentation — a marked weld on the drawing connects to its WPQR and WPS, to a qualified welder and NDT inspection, and it all collects into the project’s technical dossier as you go. EN ISO compliant, in one place, ready for the customer or the institute.

Mark the weld. The sheet writes itself.

Mark it on the drawing with an ISO 2553 symbol. From it and from your WPQR, Weldmaster fills in the EN ISO 15609-1 sheet — with the joint sketch, the validity range and the heat-input window.

Weldmaster: weld W25 (fillet, a5) marked on a PDF drawing and WPS-08, filled in from the weld and the WPQR
Weldmaster: weld W25, fillet a5 all around, marked with an ISO 2553 symbol on a PDF drawing WPS-08 to EN ISO 15609-1: joint sketch, validity range and heat-input window from the WPQR
Drawing · 1/2

One thread through the whole project.

A marked weld connects to its WPQR and WPS, to the assigned welder and their certificate, and to NDT inspection. By the time the project is finished, the dossier is already assembled — no retyping between tables and emails.

Weld→WPQR→WPS→ Welder + cert→NDT →Dossier

You start by marking a weld on the drawing. The system checks which WPQR covers it, generates a WPS from it, suggests a qualified welder with a certificate and links NDT inspection — everything collects into the technical dossier as you go, ready to hand over.

Modules that talk to each other.

One program, built from modules. They all share the same project data — no retyping.

ISO 2553

Drawing — weld marking

Marking welds on the drawing per ISO 2553. Inside a project every symbol becomes a node that carries its own documentation through the whole process.

EN ISO 15614-1

WPQR — coverage check

For each production weld it finds which WPQR covers it (thickness, position, material group, process) — the range exactly per EN ISO 15614-1.

EN ISO 15609-1

WPS — generation

From a weld + WPQR pair it builds a WPS per EN ISO 15609-1; the run parameters are anchored to the actual runs from the certificate and always within the window the WPQR allows. Edit and save inside the project.

EN ISO 9606-1

Welders — qualifications

Range of qualification and weld check per EN ISO 9606-1, plus tracking of the 6-month confirmations and certificate validity. The register suggests a qualified welder for each weld.

EN ISO 9712

NDT — inspection

A register of NDT personnel certificates — method, level, validity — tied to weld inspections in the project, with scope by execution class per EN 1090-2.

audit-ready

Dossier — technical file

Everything above collects into the project’s technical dossier as you go — a coverage overview and an export, ready to hand over to the customer or the institute.

Free or connected.

All tools are free to use and print. A subscription unlocks saving and the connected process.

Free

0 €

  • All tools, no sign-up
  • Weld marking → PDF export
  • WPQR check for a single weld
  • Qualification and check for one welder
  • Cut optimization → print
  • You enter the data again each time

Subscription

9,99 € €0 first month

then 9,99 € / month · cancel anytime

or 99 € / year (≈ 2 months free) · 299 € one-off forever

Prices exclude VAT. We charge in EUR — for payment in another currency, the card issuer converts the amount at its own rate.

  • Saving into a project
  • A WPQR library with recommendations for each weld
  • WPS generation and editing
  • A register of welders and NDT personnel
  • Original welder certificates stored
  • A technical dossier for the project — in one click
Start a subscription →

Standards are not suggestions.

Many WPQR/WPS programs are just a paraphrase of the standard — the developer reads a clause, interprets it their own way, adds tolerances that are not in the text. The result: two programs give two different ranges of qualification for the same WPQR.

Prokon computes the range exactly as the standard defines it — every rule is tied to a specific article, not to our interpretation. If you find a deviation from the standard, write to us and we will fix it.

Your data stays yours.

Data is stored in the EU. Every organization is separate — your projects, welders and WPQRs are visible only to you. One user can have access to several organizations (an external coordinator, an engineering office).

Exports are ready to hand over to the customer or the institute. You can cancel the subscription at any time; you export your data and take it with you.